Perancangan Pembangkit Listrik Tenaga Deisel (PLTD) di Merauke
Abstract
The Diesel Power Plant (PLTD) currently used in Merauke has a capacity of only 12.6 MW, while the peak load reaches 17.39 MW, resulting in frequent power outages in Merauke Regency. Additionally, the location of PLTD Kelapa V in the city center causes significant noise pollution, disturbing nearby residents. To address these issues, a new PLTD with a capacity of 100 MW is needed in the warehouse and industrial sector, utilizing a techno-architecture design approach. This research employs data collection methods such as interviews, documentation, books, reports, literature studies, journals, site analysis, and building analysis. The result of this study is the design of a diesel power plant with a techno-architecture approach that can enhance the power and performance capacity of PLTD Kelapa V, ensuring adequate electricity supply for Merauke.
References
[2] Al- Bahra bin Ladjamudin.
analisis Dan Desain Sistem Informasi, Yogyakarta 2005
[3] D.A Kurniawan, dkk. Pembangkit listrik tenaga diesel, Singaraja,2003.
[4] D. Hermawan Surakarta Automotive Center Dengan Pendekatan Arsitektur Techno-Arthistic, Surakarta 2004
[5] Syofuan, Sistem Utama Sebuah Pusat Listrik Tenaga Mesin Gas (PLTMG), Pekanbaru Riau 2013
[6] Dr. A. Arismunandar. Buku Pegangan Teknik Tenaga Listrik, Jakarta 2004.
[7] Manurunmg Chandra.Pembangkit Listrik Tenaga Gas Pesanggaran, Bali 2017
[8] F. D.K Ching . Architectur Form Space And Order, John Wiley & Sons, nc, New Jersey 2007
[9] Departemen Pekerjaan Umum Persyaratan Teknis Aksesibilitas pada Bangunan Umum dan Lingkungan jakarta 1998
[10] E. Neufert, Data Arsitektur Jilid 2 , Erlangga, Jakarta 2002
[11] D. Tangoro, Utilitas Bangunan, Universitas Indonesia Jakarta 2006
[12] N. Ali, Apa bedanya pengcegahan vs Perlindungan Kebakaran Multipilar Energi, Bekasi, 2019
[13] Dep. PU. Balitbang. Permukiman, Pedoman Pengoprasian Dan Pemeliharaan instalasi Pengolahan Air limbah, Dep. PU. Banlitbang, jakarta 2001
[14] D.PUPRP Pemerintahan Kabupaten Merauke, Merauke 2017
[15] Prof. Dr. Suryana, M.Si, Metodologi penelitian Universitas Pendidikan Indonesia, Bandung, 2010
[16] L.P. Direksi Komisioning pusat listrik tenaga diesel/ mesin gas pltd/mg, no 0103, SPLN, Jakarta, 2015.


